Les amis du CENA
Sagnier,Yves
Notes
- N89-020: CONCEPTION POURSUITE-PROJET HADAMARD-DES ATTRIBUTIONS DETERMINATIONS
- N89-228: HADAMARD-RAPPORT 1 D EVALUATION 3 VERSION O
- NT95-193: PASSERELLE D UTILISATION DE LA SURVEILLANCE ENRICHIE DU MODE S
- NA95-223: COMPTE RENDU REUNION "FORUM" DU 10/07/95
- NA95-225: CCTP MARCHES D'ASSISTANCE POUR LES ETUDES SUR LA GESTION TECHNIQUE DU TRAFIC AERIEN-MARCHES A LOTS
- NT95-265: PROPOSITION POUR UN SIMULATEUR AVION SIMPLIFIE AU CENA
- NT95-270: C/R REUNION PROJET "SIMULATEUR AVION CENA"
- NT95-346: COMPTE-RENDU DE LA REUNION DU 08/11/95 ENTRE CENA ET EEC/BRETIGNY EN VUE D'UNE COLLABORATION SUR L'EVOLUTION DU SIMULATEUR AVION MCS
- NA95-347: RAPPORT DE PRESENTATION DES MARCHES D'ASSISTANCE DU CENA POUR LE SITE D'ATHIS (AO 95/24)
- NT95-362: PROBLEMES DE FIABILITE DES STATIONS MODE-S EXPERIMENTALES
- NA95-368: EVALUATION DES OFFRES DE L'APPEL D'OFFRE 95/24
- NT95-374: DIS (DISTRIBUTED INTERACTIVE SIMULATION)
- NT95-386: COMPTE-RENDU DE LA REUNION PAD DU 19/12/95
- NA95-390: C/R REUNION CENA-SEFA SUR LES SIMULATEURS BORD (27/07/95)
- NT96-029: L'ARINC 627 EST-IL INTEGRABLE DANS L'ATM
- NT96-037: REMISE A JOUR DU PROJET PLAN PD/3 : PHASAGE DU PROGRAMME IOCP HCA
- NT96-038: COMPTE-RENDU DE LA REUNION INTERNE IOCP HCA DU 19/02/96
- NT96-053: EVOLUTIONS DU MCS SOUHAITES PAR LE CENA
- NT96-060: NOTE DE REFLEXION SUR L'AVENIR DU PROJET VIZIR
- NT96-066: COMPTE-RENDU REUNION PD/3-PLANNING AMSTERDAM DES 11,12/3/96
- NT96-071: COMPTE-RENDU DE LA REUNION SUR L'ACCORD DE DEVELOPPEMENT MCS ENTRE CENA ET EEC LE 08/03/96
- NT96-074: COMPTE-RENDU REUNION SUIVI PD/3-ATHIS LE 18/03/96
- NT96-083: COMPTE-RENDU DE LA REUNION DU 23/03/96 "INTEGRATION DE TNP DANS L'IOCP HCA"
- NT96-108: COMPTE-RENDU VISIO CONFERENCE
- NT96-118: PHASAGE PREVISIONNEL DU PROGRAMME IOCP HCA
- NT96-119: COMPTE-RENDU DE LA CONFERENCE ADS-B DU 02/95/96
- NT96-120: PRESENTATION SOMMAIRE DU RAPPORT FAA SUR LE 'TWO WAY DATA LINK'
- NT96-123: COMPTE-RENDU DE LA REUNION SCALA DU 04/04/96
- NA96-130: ADDENDUM AU RAPPORT DE PRESENTATION DES PROJETS DE MARCHES CONSECUTIFS A L'APPEL D'OFFRES
- NT96-146: COMPTE-RENDU DE LA VISIOCONFERENCE SCALA DU 31/05/96 AU MATIN
- NT96-150: COMPTE RENDU REUNION INTERNE CENA DE SUIVI PD/3 ATHIS-MONS LE 06/05/96
- NT96-160: COMPTE-RENDU DE LA REUNION "EVOLUTION DE LA REGION PARISIENNE UD 10 JUIN 96 ET AUTRES INFORMATIONS AFFERENTES
- NT96-179: CHOIX DES LIAISONS POUR LE CNS-ATM
- NT96-183: AVANCEMENT DE L'INTEGRATION DE TNP DANS L'IOCP HCA AU 02/07/96
- NT96-199: COMPTE-RENDU PRESENTATION TRANSITION ATN-ARINC 622
- NA96-234: COMPTE RENDU REUNION DE DIRECTION DU 10/09/96
- NT96-235: COMPTE RENDU REUNION DLC/RDS DU 11/09/96 A BRETIGNY
- NT96-266: COMPTE RENDU REUNION DU 26/09/96 SUR LA COOPERATION SUR LE MCS
- NA96-284: PCC DU 14-16 OCTOBRE AU DLR
- NA96-291: ANNEXE TECHNIQUE POUR L'ASSISTANCE SUR LE PROGRAMME PHARE
- NT96-302: COMPTE RENDU STNA/CENA/EUROCONTROL PETAL 2 DU 25/10/96
- NT96-303: COMPTE RENDU REUNION GOLD/PAD DU 30/10/96
- NA96-308: ANNEXE TECHNIQUE GESTION DU PROJET PD3
- NT96-309: COMMENTAIRE AU COMPTE RENDU OFFICIEL DU PCC/37
- NT96-327: A DATA LINK THAT MEETS REQUIREMENTS MODE S
- NA96-349: COMPTE RENDU REUNION DATA-LINK DU 10/12/96
- NT97-018: COMPTE-RENDU REUNION DU PCC/38 A EUROCONTROL BRETIGNY DU 14 AU 16/01/97
- NT97-030: MINUTES OF THE 3RD MEETING ON THE FRENCH IMPLICATION IN PETAL II
- NT97-056: COMPTE-RENDU DE LA REUNION GENERALE PLEINIERE DU SICASP A MONTREAL DU 10 AU 19 FEVRIER 1997
- NA97-065: CCTP PRESTATIONS D'ASSISTANCE MAITISE D'OEUVRE PD3
- NA97-120: ANNEXE TECHNIQUE POUR UNE ASSISTANCE SUR LE PROJET PD/3
- NT97-127: L'ETAT DU NEGOTIATION MANAGER (NM) DE PHARE (EN ANGLAIS)
- NT97-128: C/R 40EME REUNION DU PHARE COORDINATION COMMITTEE (PCC/40) A LANGEN 21-22 MAI 1997
- N97-146: C/R DE LA VISIOCONFERENCE STNACENA DU 10/6/97 SUR LE DATA FLASH MODE S
- N97-168: RAPPORT DE PRESENTATION D'UN PROJET DE MARCHE : ASSISTANCE MAITRISE D'OUVRAGE PD/3
- N97-169: C/R DE LA REUNION DE DIRECTION RESTREINTE DU 8 JUILLET 97
- N97-170: C/R DE LA VISIOCONFERENCE CALLIOPE ENTRE CENA ET STNA LE 30 JUIN 97
- N97-175: CORRESPONDANCE ENTRE LES APIS CMS V2 DU TP DU NATS ET SES FONCTIONS INTERNES
- N97-176: C/R DE LA REUNION "CONTROLEURS" CENA-SCTA DU 23/7/07 A/M
- N97-185: C/R DU PCC/41 A BRUXELLES LES 30 ET 31 JUILLET 97
- N97-186: C/R DE LA VISIOCONFERENCE DU 5/7/97 SUR L'INTEGRATION DU MODE S DANS PROATN
- N97-206: 3EME REUNION DU COMITE DIRECTEUR EOLIA DU 10 SEPTEMBRE 1997
- NT97-228: COMPTE-RENDU DE LA VISIOCONFERENCE SUR LE POINT 6 DU PLAN FAA/EUROCONTROL (19/09/97)
- NT97-229: COMPTE-RENDU REUNION DU 42EME PHARE COORDINATION COMMITEE PCC A HURN 24-25 SEPTEMBRE 97)
- NT97-230: COMPTE-RENDU DE LA VISIOCONFERENCE DU 06/10/97 SUR LA COOPERATION AVEF AVEC AIRBUS POUR LA MISE EN OEUVRE DU DATA LINK
- NT97-233: ISSUES RELATIVE TO PATS AND CMS AS CONCERNED CENA
- NT97-260: CCTP PRESTATIONS D'ASSISTANCES TECHNIQUES A LA DEMONSTRATION PHARE PD3
- NT97-262: COMPTE-RENDU DE LA REUNION DATA-LINK AIRBUS (DALIDA) DU 12/11/97
- NT97-276: PRESENTATION DE L'ACTION PLAN 6 DE LA COOPERATION FAA-EUROCONTROL AU 26/11/97
- NT97-302: COMPTE-RENDU DE LA REUNION DE REMUE-MENINGES DU 5 DECEMBRE 97
- NT97-303: COMPTE-RENDU D'AVANCEMENT DU PROJET DALIDA AU 17/12/98
- NT97-304: COMPTE-RENDU DE LA REUNION D'AVANCEMENT DALIDA DU 18/12/98
- NT97-305: NOTE DE SYNTHESE DU PROJET DALIDA POUR DNA/ADT
- NT97-306: COMPTE-RENDU PHARE COORDINATION COMMITEE 43
- NT97-307: COMPTE-RENDU DE LA REUNION AMANDA DU 20 NOVEMBRE 97
- NT98-001: POINTS 6 ET 7 DE LA PLANIFICATION : ASAS ET CNS INFRASTRUCTURE
- NT98-010: COMPTE-RENDU DE LA TELECONFERENCE PCC DU 15/01/98
- NT98-011: COMPTE-RENDU DE LA REUNION PREPARATOIRE SCALA (21/01/98)
- NT98-012: COMPTE-RENDU DE LA 2EME REUNION DALIDA AVEC L'AEROSPATIALE/STNA/CENA DU 16/01/98
- NT98-016: COMPTE-RENDU DE LA REUNION SCTA-STNA-CENA-DNA SUR SCALA (23/01/98)
- NT98-021: COMPTE-RENDU DE LA REUNION D'AVANCEMENT DALIDA STNA-CENA DU 23/01/98
- NA98-022: CHOIX DES SOCIETES CANDIDATES SOCIETES CANDIDATES RETENUES POUR LE 2 EME TOUR DE L'AO 97/49
- NA98-027: INSTRUCTIONS POUR LA CONTINUATION DE LA PROCEDURE DES MARCHES D'ATHIS-MONS
- NA98-028: CCTP DE REALISATION DU MODULE DE PRODUCTION DES ADVISORIES (MPA) EN SORTIE DU T.P.
- NT98-037: C/R DU PCC46 DE PHARE AU CENA ATHIS-MONS,LE 18 SEPTEMBRE 1998
- NT98-039: COMPTE-RENDU DE LA REUION CENA-STNA-AIR FRANCE DU 11/02/98 SUR DALIDA
- NT98-042: COMPTE-RENDU DE LA 44EME REUNION "PHARE COORDINATION COMMITEE (PCC)
- NT98-054: DOCUMENT SUR LE POINT 6 DE LA PARTICIPATION : CHANGEMENT DE ROLE ET ASAS
- NT98-055: DOCUMENT SUR LE POINT 7 DE LA PLANIFICATION : INFRASTRUCTURE CNS
- NT98-056: COMPTE-RENDU DE LA REUNION SAS-SUR-TCC SUR LES PADS DU 12 FEVRIER 1998
- NA98-066: PRESTATIONS ETUDES/INFORMATIQUE SUR LE PROJET DALIDA
- NT98-067: PLAN DES TACHES DE LA PRE-ETUDE DALIDA EN 1998
- NT98-068: COMPTE-RENDU DE LA 4EME REUNION DALIDA ENTRE STNA,CENA ET AEROSPACIALE (20 MARS 1998)
- NT98-096: COMPTE RENDU DE LA REUNION DALIDA AVEC DNA,AIRBUS,AEROSPATIALE STNA ET CENA DU 25 MARS 1998
- NT98-104: ACT/PCC44/6 : 1998 CMS DETAILED PROJECT PLAN
- NT98-105: COMPTE-RENDU DU PCC/45 A BRETIGNY LE 23 AVRIL 1998
- NT98-106: DE L'ARCHIVAGE AU CENA
- NT98-117: PLAN DE TRAVAIL DU PROJET DALIDA DU 1/10/97 AU 30/06/99
- NT98-120: COMPTE-RENDU DE LA REUNION LAMIH SUR AMANDA DU 12 MAI 1998
- NT98-121: COMPTE-RENDU DE LA REUNION DU 11 MAI 1998 ENTRE CENA-STNA AEROSPATIALE SUR DALIDA
- NT98-144: COMPTE-RENDU DE LA REUNION "ARCHIVAGE" DU 12 JUIN 1998
- NT98-146: COMPTE-RENDU DE LE REUNION CENA-AEROSPATIALE-EUROCONTROL DU JUIN SUR LES PARAMETRES AVION DESCENDANTS
- NT98-147: COMPTE-RENDU DE LA REUNION INTERNE AU CENA DU JUIN SUR LES PARAMETRES AVION DESCENDANTS
- NA98-157: CCTP MARCHE VALORISATION DES PROJETS ET ELABORATION DE LA DOCUMENTATION INTERNE ET EXTERNE DU CENA
- NT98-162: MEMO SUR L'ATTITUDE RECENTE D'EUROCONTROL EHQ DANS PHARE
- NA98-163: CCTP POUR UNE ASSISTANCE PROGRAMME AVION PHARE
- NA98-170: NOTE DE PRESENTATION DU 1ER AVENANT A LA CONVENTION AMANDA/DECART
- NT98-184: C/R DE LA 8EME REUNION DALIDA ENTRE CENA,STNA ET AEROSPATIALE.
- NA98-189: CCTP DE LA GESTION DE PROJET SUR L'EXTENSION PD3
- NA98-196: COMPTE RENDU DE LA REUNION "FORUM" DU 6 OCTOBRE 1998 A ATHIS-MONS
- NT98-213: COMPTE RENDU DE LA 2EME REUNION DE COMITE DE COORDINATION SOL/BORD DU 6/11/1998
- NA98-217: RAPPORT DE PRESENTATION DU MARCHE : VALORISATION DES PROJETS ET ELABORATION DE LA DOCUMENTATION A USAGE INTERNE ET EXTERNE DU CENA
- NA98-218: RAPPORT DE PRESENTATION : GESTION DE PROJET DE L'EXTENSTION PD/
- NA98-219: ELEMENTS DE REPONSES AUX QUESTIONS POSEES PAR LE RAPPORT A LA CSM/I DU 13/11/1998
- NA98-221: COMPTE RENDU DU PASSAGE EN CSM/I DU VENDREDI 13 NOVEMBRE 1998 DES AO97/49 ET 52
- NT98-226: COMPTE RENDU DE LA REUNION "ORGANISATION PROJET CASH" DU 23 NOVEMBRE 1998
- NA98-513: ELEMENTS DISCUTES REUNION DU 15 JANVIER SUR LES MARCHES TOULOUSE
- NT99-003: IMPLANTATION DES SERVICES DATA-LINK ET CONSEQUENCES SUR LE CAUTRA (1999-2004)
- NA99-017: LE MANUEL DU PARFAIT PASSEUR D'AVENANTS
- NA99-019: CCTP POUR DES PRESTATIONS SUR LES PROJETS AGLAE/MODE S ET ESCAPADE
- NT99-037: C/R DE LA VISIOCONFERENCE SUR L'ARCHIVAGE DU 5 FEVRIER 1999
- NT99-042: NOTE DE PREPARATION DE LA REUNION DATA LINK A LA DNA LE 10 MARS 1999
- NT99-048: LES LIENS ENTRE PETAL2,PIT ET LINK2000+
- NT99-049: C/R DE LA REUNION SUR NUP DU 16 AVRIL 1999 A ATHIS-MONS
- NT99-056: COMPTE-RENDU DE LA REUNION DATA LINK A DNA LE 10 MARS 1999
- NA99-061: PREINFORMATION ET SEUILS DES MARCHES
- NA99-064: CCTP DOCUMENTATION A USAGE INFORMATIF ET VALORISATION DES PROJETS CENA
- NA99-066: CCTP "GESTION DU PROJET DALIDA"
- NT99-072: COMPTE RENDU DE LA REUNION SCTA-CENA-STNA DE PREPARATION DE WORKSHOP PADS D'EUROCONTROL,LE 30 MARS 1999.
- NT99-091: COMPTE-RENDU DE LA PREMIERE REUNION DU C/AFT EUROPEEN (BUSINESS CASE DE LINK2000+) 20-21 AVRIL 1999
- NA99-096: CCTP PHARE POUR DES PRESTATIONS SUR LES PROJETS ESCAPADE ET MODE S
- NT99-122: COMPTE RENDU DE LA REUNION DU 5 JUILLET 1999 SUR LE PLAN D'EXPERIMENTATION DATA LINK
- NT99-126: COUT "NOMINAL" DU PROGRAMME D'IMPLANTATION DES SERVICES SCALA/LINK 2000+ EN FRANCE
- NT99-129: COMPTE RENDU DE LA 4EME REUNION DU GROUPE DE COORDINATION DNA DU PROGRAMME LINK2000+
- NA99-135: RAPPORT DE PRESENTATION DU PROJET DE MARCHE "PRESTATIONS ADAGIO")
- NT99-142: C/R DE LA 5EME REUNION DU DRAFTING GROUP LINK2000+
- NT99-169: POINT SUR L'IMPLICATION DU CENA DANS LE PROJET EMERTA
- NT99-170: COMPTE RENDU DE LA VISITE AU STNA DE L'EQUIPE ATM LINK2000+ LE 15 OCTOBRE 1999.
- NA99-172: CCTP "ASSISTANCE POUR LA COORDINATION DE L'ACTIVITE "DATA LINK"
- NT99-176: MISE A JOUR DU POINT 7 DE LA PLANIFICATION : INFRASTRUCTURE CNS
- NT99-177: TENTATIVE DE QUANTIFICATION DES ETUDES ET DE DEFINITION D'UNITES D'OEUVRE
- NT99-180: LES LIENS ENTRE PETAL2,LINK2000+ ET LES BASELINES
- NA99-191: CCTP POUR DES PRESTATIONS D'ETUDE ET DEVELOPPEMENT SUR LES ACTIVITES MODE S
- NT99-192: POINT SUR LE PROJET AMANDA FIN 1999
- NA99-194: CAHIER DE CLAUSES TECHNIQUE PARTICULIERES POUR L'ELABORATION D'UN MANUEL DE REFERENCE CENA D'UNITES D'OEUVRE DE RESULTAT D'ETUDES
- NT99-195: MISE A JOUR DU POINT 6 DE LA PLANIFICATION : CHANGEMENT DE ROLE & ASAS
- NA99-197: RAPPORT DE PRESENTATION D'UN MARCHE NEGOCIE SUR DES PRESTATIONS MODE S
- NT99-198: INTEGRITE/CONFIDENTIALITE DES DONNEES DU CENA D'ATHIS-MONS-PROPOSITIONS DE DIRECTIVES D'UTILISATION
- NT00-004: PLAN CENA/STNA D'EVALUATION DU DATA-LINK "LINK2000+ FRANCE"
- NA00-015: CCTP POUR DES PRESTATIONS RELATIVES AUX PROJETS AGLAE/MODE S ET ESCAPADE
- NT00-017: BREF C/R DU 3EME GP ARTAS (21/01/2000)
- NT00-018: C/R DE LA REUNION "THEMATIQUE 4" DU PROJET I-RST LE 26 JANVIER 2000
- NA00-032: NOTE DE PRESENTATION DE LA COMMANDE POUR LA REDACTION D''UN MANUEL D''UNITES D'!'OEUVRES
- NT00-046: PLAN DE DEVELOPPEMENT DU PROJET VOCALISE
- NT00-058: C/R PARTIEL DU POINT DE CONTROLE RADAR A DNA (31/03/2000)
- NT00-060: C/R DE LA REUNION DATA-LINK DU 7 MARS 2000
- NT00-062: LA PLACE CENTRALE DU MODE DANS LES CONCEPTS PADS & ADS-B
- NA00-066: CCTP PHARE SIMULATION DATA-LINK
- NA00-092: CAHIER DES CLAUSES TECHNIQUES PARTICULIERES PREPARATION AU PROJET GATE TO GATE 2005
- NA00-095: COMPTE-RENDU DE LA REUNION "GRASSINEAU,LE VENDREDI 23 JUIN MATIN AU SIEGE DGAC
- NA00-112: C/R DE LA REUNION DE DIRECTION DU 4 JUILLET 2000 (16 MESSIDOR AN 208)
- NA00-125: RAPPORT DE PRESENTATION DU MARCHE "PREPARATION DU PROJET GATE TO GATE 2005"
- NT00-155: COMPTE-RENDU DE LA 7EME REUNION PLENIERE DU SICASP,A MONTREAL (11-22 SEPTEMBRE 2000)
- NT00-177: POINT SUR LE PROJET AMANDA MI-2000 (REUNION DU 17JUILLET)
- NT00-602: COMPTE-RENDU DE LA 32EME REUNION DU GROUPE DE TRAVAIL WG 2 DU GROUPE D'EXPERTS SICASP DE L'OACI
- R00-014: VERSION 1.2 DU MANUEL DE REFERENCE DES UNITES D'OEUVRE DU CENA
- NT01-023: CONSIDERATIONS SUR LE PLAN DE LINK2000+ FRANCE
- NA01-024: RAPPORT SUR LES MARCHES INFORMATIQUES DU CENA POUR LA COMIB 2001
- NA01-025: -MARCHE PUBLIC DE PRESTATIONS INTELLECTUELLES-CCTP "SUPPORT TECHNIQUE A MAITRISE D'OUVRAGE SUR LE PROJET GATE TO GATE 2005"
- NA01-036: PROPOSITIONS DE JURISPRUDENCE SUR LES PIECES OBLIGATOIRES A UN APPEL A CANDIDATURES
- NA01-037: COMPTE RENDU DE L'ENTREVUE AVEC LE SECRETAIRE DE LA CSMI LE 28 FEVRIER 2001 (10 VENTOSE AN 209)
- NA01-038: MODIFICATIONS APPORTEES AUX CLAUSES TECHNIQUES DE LA TRANCHE CONDITIONNELLE N.3 DU MARCHE 91.12.117
- NA01-045: CHOIX DE LA LISTE RESTREINTE DES CANDIDATS A L'APPEL D'OFFRE A0 00/07
- NA01-062: RAPPORT DE PRESENTATION D'UN PROJET D'AVENANT AU MARCHE 00.19.007
- NA01-063: NOTE DE PRESENTATION DE LA 3EME CONVENTION AMANDA/DECART
- NA01-071: COMPTE RENDU DE LA REUNION DU GROUPE CENA DE SUIVI DE L'ARTT LE 02 AVRIL 2001.
- NA01-084: C/R DE LA REUNION DES CORRESPONDANTS ARTT DU 25 AVRIL 2001
- NA01-090: POURSUITE DE LA PREPARATION A GATE TO GATE
- NA01-097: RAPPORT DE PRESENTATION DU PROJET DE MARCHE POURSUITE DE LA PREPARATION DU PROJET G2G2005
- NT01-124: METHODOLOGIE DES PROJETS AU CENA
- NA01-129: RAPPORT DE PRESENTATION DU PROJET DE MARCHE "SUPPORT TECHNIQUE A MAITRISE D'OUVRAGE SUR LE PROJET GATE TO GATE 2005"
- NA01-140: PREPARATION DES FICHES BUDGET 2002
- NA01-159: C/R DE LA REUNION DE DIRECTION DU 13 SEPTEMBRE 2001
- NT01-160: LE PROJET INTERNAT ET LES QUESTIONS URGENTES AFFERENTES
- NT01-167: SUITES DONNEES A L'ETUDE CALLIOPE EUROPE
- NA01-174: CCTP POUR DES PRESTATIONS D'ETUDES SUR LE PROJET CALLIOPE
- NA01-178: CCTP NUMERISATION DES NOTES ET RAPPORTS DU CENA.
- NA01-196: MODIFICATION DES ABONNEMENTS A ATHIS-MONS
- NA01-232: PROPOSITION D'APPLICATION DE LA PREINFORMATION DES 2002
- NT01-233: C/R DE LA REUNION DU COMITE DE PILOTAGE BUREAUTIQUE DGAC DU 22 NOVEMBRE 2001
- NA01-237: CCTP ETUDE DU CONCEPT ATM SUR LE PROJET GATE TO GATE 2005 DECEMBRE 2001
- NT01-241: SYNTHESE DU LIVRE BLANC SUR LES TRANSPORTS DE LA COMMISSION EUROPEENNE (2001)
- NT01-242: ELEMENTS D'INFORMATION SUR L'ACAS,L'ASAS ET LE MODE S POUR L'ANC
- NT01-255: C/R INTERNE CENA DE LA REUNION LINK 2000+ FRANCE A DNA LE 26/02/2001
- NA02-001: ANNEXE TECHNIQUE POUR LE BC/1 SUR LE MARCHE 98.12.132 (CALLIOPE)
- NA02-014: RAPPORT DE PRESENTATION DU PROJET DE MARCHE CALLIOPE (INCOHERENCES SOL-BORD) (AO 02/01)
- NA02-023: DE L'UTILISATION EVENTUELLE DE LA NOMENCLATURE SPECIFIQUE "RECHERCHE ET DEVELOPPEMENT" DANS LES MARCHS DU CENA
- NT02-024: C/R DE LA REUNION DATA-LINK A LA DNA LE 29 JANVIER 2002
- NT02-036: C/R DE LA 3EME REUNION DU GROUPE I-SPACE/SSA LE 5 FEVRIER 2002
- NT02-070: COMPTE RENDU DE LA REUNION "PROGRAMME MODE S DNA" DU 22 MARS 2002
- NT02-081: COMPTE-RENDU DE LA 5EME REUNION SEGA DU 04 AVRIL 2002
- NT02-099: C/R DE LA CONFERENCE D'INFORMATION DE LA DRAST SUR LE PCRD/6
- NA02-119: SITUATION DU PROJET GATE TO GATE ET CONSEQUENCES SUR LE MARCHE D'AMO
- NT02-129: NOS OBJECTIFS DANS GATE TO GATE 2005
- NA02-135: CAHIER DES CLAUSES TECHNIQUES PARTICULIERES POUR DES PRESTATIONS D'ETUDE SUR L'IMPACT DE LA SECURISATION DES FUTURES COMMUNICATIONS NUMERIQUES AIR-SOL ATC ET SUR LEUR DISPONIBILITE OPERATIONNELLE.
- NT02-150: CALCUL DES COUTS INFORMATIQUES DANS LES PROJETS EUROPEENS
- NA02-179: PREPARATION DES FICHES DE DEMANDE DE BUDGET 2003
- NA02-180: NOTE DE PRESENTATION DU MSFP ETUDES DE SECURISATION DE L'ATN
- NT02-186: C/R INTERNE CENA DU COMITE DE PILOTAGE BUREAUTIQUE DU 21/11/02
- NT02-193: C/R DE LA (PETITE) REUNION ARCHIVAGE TENUE A ATHIS LE 19 SEPTEMBRE 2002
- NT02-200: C/R DE LA VISIOCONFERENCE DE PREPARATION DU PCC G2G (3 OCTOBRE 2002)
- NT02-207: POINT 5 DE LA PLANIFICATION 2002 : CONCEPTS FUTURS
- NT02-209: LE PROCESSUS D'EXPERIMENTATIONS DANS GATE TO GATE
- NA02-217: LA FORMATION SUR LA SECURITE D'UTILSATION DES NOUVELLES TECHNOLOGIES (SSI)
- NA02-232: ANNEXE TECHNIQUE BCM 2 / MARCHE 99.039 :
- NT02-251: MANUEL DE REDACTION D'UN CCTP
- NT03-025: STRATEGIE DNA SUR LE PROJET C-ATM
- NT03-029: EXPOSE SUCCINCT DES TROIS POSSIBILITES DE PLATE-FORME ETMA DANS G2G (POUR ETUDE APPROFONDIE)
- NA03-034: COMPTE-RENDU DE LA REUNION DE DIRECTION DU 11 FEVRIER 2003 (23 PLUVIOSE AN 211)
- NT03-037: ETAT DU PROJET C-ATM ET ACTIONS A COURT TERME
- NT03-039: C/R DE LA 4EME REUNION DU CONSORTIUM C-ATM LES 18 ET 19 FEVRIER 2003 A BAGNEUX
- NT03-042: C/R DE LA 5IEME REUNION PREPARATOIRE DU CONSORTIUM C-ATM A BRUXELLES (27/02/03)
- NT03-046: C/R DE LA REUNION PREPARATOIRE AU PCC/03 DE GATE TO GATE 2005 A BRUXELLES,LE 6 MARS 2003
- NT03-059: COMPTE-RENDU DE LA 3EME REUNION PLENIERE DU PCC DE GATE TO GATE
- NA03-060: RAPPORT DE PRESENTATION DES MARCHES PC BUREAUTIQUE ET SERVEURS
- NA03-074: ANNEXE TECHNIQUE AU BON DE COMMANDE N.03/03 SUR MARCHE 02.19.009/CENA
- NT03-096: LES APPLICATIONS DATA-LINK DANS GATE TO GATE 2005
- NT03-097: COMPTE-RENDU DE LA REUNION MAESTRO/G2G AVEC SOFREAVIA LE 20 MAI 2003
- NT03-105: COMPTE-RENDU DU PCC/04 DE GATE TO GATE 2005,A ARENZANO,JUIN 2003
- NA03-118: CCTP ASSISTANCE A MAITRISE D'OUVRAGE SUR LE PROJET GATE TO GATE 2005
- NT03-119: ETAT DU PROJET PCRD/6 C-ATM DEBUT JUILLET 2003
- NT03-135: NOTES DU WORKSHOP DU WP3 DE GATE TO GATE A TOULOUSE,JUILLET 2003
- NA03-142: CCTP POUR LA DEFINITION DES CONFIGURATIONS EXPERIMENTALES DANS LE PROJET GATE TO GATE 2005
- NA03-146: RAPPORT DE PRESENTATION DU PROJET DE MARCHE ASSISTANCE A MAITRISE D'OUVRAGE SUR LE PROJET GATE TO GATE 2005
- NA03-149: NOTE DE PRESENTATION DU MSFP DEFINITION DES CONFIGURATIONS EXPERIMENTALES DANS LE PROJET GATE TO GATE 2005
- NT03-156: LE SYSTEME DE CRYPTOGRAPHIE RSA
- NT03-157: C/R DE LA REUNION CDM/C-ATM AVEC AIR-FRANCE LE 3 JUILLET 2003
- NA03-161: ANNEXE TECHNIQUE AU BON DE COMMANDE N.06/03 SUR MARCHE 02.19.009/CENA
- NT03-172: POINT SUR C-ATM AU 23 SEPTEMBRE 2003
- NT03-174: C/R DE LA REUNION C-ATM DU 2 OCTOBRE 2003
- NT03-191: COMPTE-RENDU DE LA REUNION CENA/STNA/THALES SUR C-ATM DU 22 OCTOBRE 2003
- NT03-198: COMPTE-RENDU DE LA REUNION DE PREPARATION C-ATM PHASE 2 DU 3 NOVEMBRE 2003 A BRUXELLES
- NT03-199: COMPTE-RENDU DE LA 5EME REUNION DU PCC DE GATE TO GATE 2005,LES 4 ET 5 NOVEMBRE 2003 A BRUXELLES
- NA03-203: CONSULTATION DES FICHES PROJET CENA VIA UN MECANISME SECURISE : CAHIER DES CHARGES
- NT03-204: C/R DE LA REUNION EXPERIMENTATIONS ATHIS 2004 DU 6/11/03
- NT03-212: C/R DU COMITE DE PILOTAGE BUREAUTIQUE DU 25 NOVEMBRE 2003
- NT03-227: NOTE SUR LE PROJET C-ATM AU 19 DECEMBRE 2003
- NT03-238: CR REUNON INTERNE CENA VISIO DU 21/05/2003
- NT03-241: REUNION TATM/DNA
- NT03-244: REUNION TATM/DNA: PLANNING ET COOPERATION
- NT03-704: COMPTE-RENDU DE LA REUNION DATA-LINK RELATIVE A L'EXPERIMENTATION LINK2000+ TENUE A LA DNA LE 15 AVRIL 2003
- NT04-012: NOTES DE LA REUNION CONCLUSIONS DE LAUDIT GATE TO GATE 2005"
- NT04-016: COMPTE-RENDU DES DEUX REUNIONS ARTAS/CDG DE JANVIER 2004
- NT04-022: FONCTIONS DATA-LINK SUR LES POSITIONS DE SIMULATION DE GATE TO GATE AU CENA--
- NT04-028: COMMENTAIRES SUR L'ETUDE COUTS/BENEFICES DU PROGRAMME LINK2000+
- NA04-040: COMPTE-RENDU DE LA REUNION DE DIRECTION DU 1ER MARS 2004
- NA04-050: CCTP DEFINITION DES INTERFACES DE LA PLATE-FORME EXPERIMENTALE DANS LE PROJET INTERNATIONAL GATE TO GATE 2005
- NA04-051: NOTE D EPRESENTATION DU MPA DEFINITION DES INTERFACES DE LA PLATE-FORME EXPERIMENTALE DANS LE PROJET INTERNATIONAL GATE TO GATE 2005
- NT04-071: C/R SUCCINCT DE LA REUNION DE PRESENTATION DE EIGC ET SEDRD DU 4 MARS 2004
- NA04-072: PUBLICATION D'AVIS DE CONSULTATIONS SUR LE WEB
- NT04-080: PREALABLE A L'EVALUATION DES SOLUTIONS CWP EN ROUTE DANS G2G
- NA04-088: ANNEXE TECHNIQUE BCM/UO : PRESTATIONS D'AMO SUR G2G DANS LA PHASE 4 DU PROJET
- NT04-092: C/R DE LA REUNION DEFINITION DES OBJECTIFS ET DES INDICATEURS DES FUTURES LOIS DE FINANCE
- NT04-102: C/R REUNION DE LANCEMENT DE LA PHASE 1 DE C-ATM (KICK-OFF MEETING) LE 6 MAI 2004
- NT04-106: C/R DE L'AUDIOCONFERENCE DE PREPARATION DU PSG/11 DE LINK2000+
- NT04-119: COMPTE-RENDU DU KICK-OFF MEETING DU WP1 DE C-ATM (10-11 JUIN 2004) A BRETIGNY
- NT04-125: C/R DE LA REUNION DU GROUPE BUREAUTIQUE LIBRE DU 24 JUIN 2004
- NT04-128: CR DE LA REUNION C-ATM CHEZ AIR FRANCE LE 28 JUIN 2004
- NT04-131: CCTP ETUDE DU CDM DANS LA PHASE 1 DU PROJET EUROPEEN C-ATM
- NT04-153: C/R DE LA REUNION C-ATM1/WP1 CENA/AIR FRANCE/EUROCONTROL DU 3 AOUT 2004
- NA04-157: NOTE DE PRESENTATION DU MPA SCANNAGE DES VIEUX DOCUMENTS DU CENA
- NT04-161: CCTP EVOLUTION DU SERVEUR DATA-LINK DANS LE PROJET GATE TO GATE 2005
- NT04-162: C/R SOMMAIRE DES REUNIONS C-ATM DU 17 AOUT 2004
- NA04-199: NOTE JUSTIFICATIVE DU MPA SPECIFICATIONS DES EVOLUTIONS DU "SERVEUR COCLICO" POUR G2G
- NA04-214: NOTE JUSTIFICATIVE MPA ETUDE CAM DANS C-ATM
- NT04-223: C/R DE LA 2EME REUNION D'AVANCEMENT DU WP1 DE C-ATM
- NT04-232: AVANCEMENT DE LA REPONSE A C-ATM PHASE II
- NA04-234: ANNEXE TECHNIQUE BCM/UO : PRESTATIONS D'AMO SUR G2G DANS LA PHASE 5 DU PROJET
- NA04-245: TRANSFERT DU PROJET SAM DE LA DIVISION ESV VERS LA DIVISION SAS
- NT04-277: COMPTE-RENDU DE LA VISIOCONFERENCE DONNEES CFMU--DU 9 DECEMBRE 2004
- NT04-289: CONVERSION DES FICHIERS SON GENERES PAR LE SYSTEME AUDIOLAN D'ATHIS-MONS
- NT04-291: C/R DU COMITE DE PILOTAGE BUREAUTIQUE DE LA DGAC DU 2 DECEMBRE 2004
- NT04-295: NOTES ON AO/37/CEE/VL/04 INFORMATION MEETING,EUROCONTROL BRETIGNY 14TH SEPTEMBER 2004
- NT05-001: HISTORIQUE DU PROJET CALLIOPE
- NT05-019: C/R DE LA REUNION D'AVANCEMENT DU WP3 DE C-ATM-1 A BAGNEUX LE 18 JANVIER 2005
- NT05-077: C/R DE LA REUNION SEQUENCEUR POUR G2G DU 11/02/05
- NA05-084: DOSSIER DE CONSULTATION POUR DES PRESTATIONS DE PSEUDO-PILOTES EN VUE DE SIMULATIONS LIEES AUX PROJETS GATE TO GATE ET VIGIESTRIP A LA DSNA/DTI/SDER DANS LES LOCAUX D'ATHIS-MONS.----
- NA05-090: DOSSIER DE CONSULTATION: PRESTATIONS DE CONTROLEURS POUR LES SIMULATIONS DU PROJET GATE TO GATE 2005 DANS LES LOCAUX D'ATHIS-MONS DE LA DSNA/DTI/SDER.--
- NT05-093: C/R DU WORKSHOP OSED DU PROJET C-ATM PHASE 1 DU 21 AU 23 MARS 2005
- NA05-094: CCTP PRESTATIONS DE VALIDATION POUR LE PROJET C-ATM
- NT05-097: COMPTE-RENDU DE LA REUNION DES ASSI LE 29 MARS 2005
- NT05-105: C/R DE LA REUNION WP3 DE C-ATM/1 DU 7 AVRIL 2005 A MADRID
- NA05-111: COUTS INFORMATIQUES DANS LES COST STATEMENTS DES PROJETS EUROPEENSM ACTUALISATION TEMPORAIRE
- NA05-123: NOTE JUSTIFICATIVE DU MPA REALISATION DES EVOLUTIONS DU SERVEUR COCLICO POUR G2G
- NT05-137: NOTE COMPLEMENTAIRE AU CCTP NT04-261 POUR L'EVOLUTION DU SERVEUR DATA-LINK
- NT05-141: C/R DE LA REUNION CASCADE/PFG/2 DU 28 AVRIL 2005 A BRUXELLES
- NA05-149: NOTE JUSTIFICATIVE DU MPA PRE-ETUDE EYE TRACKER POUR G2G
- NT05-157: C/R DU COMITE DE PILOTAGE BUREAUTIQUE DGAC DU 19 MAI 2005
- NA05-167: NOTE DE PRESENTATION DU MPA VALIDATION POUR LE WP3.2.1 DE C-ATM
- NT05-172: C/R DE LA REUNION SERVEUR DATA-LINK POUR G2G DU 9 JUIN 2005
- NA05-187: COMPTE-RENDU DE LA REUNION DE SOUS-DIRECTION SDER DU 20 JUIN 2005
- NT05-193: C/R DE LA 3EME REUNION DU GROUPE PFG DE CASCADE LE 29 JUIN 2005--
- NT05-203: C/R DE LA REUNION OSED IM&S DE C-ATM DU 7 JUILLET 2005
- NA05-219: CCTP UTILISATION D'UN EYE-TRACKER SUR UNE POSITION EXPERIMENTALE DE CONTROLE DANS LE PROJET GATE TO GATE
- NT05-224: CCTP ADAPTATION DU SEQUENCEUR MAESTRO SUR LE BANC DE TEST GATE TO GATE 2005
- NA05-225: NOTRE DE PRESENTATION DU MPA ADAPTATION DU SEQUENCEUR MAESTRO SUR LE BANC DE TEST GATE TO GATE 2005
- NA05-226: CCTP APPROFONDISSEMENT DU CDM DANS LA PHASE 1 DU PROJET EUROPEEN C-ATM
- NA05-227: NOTE DE PRESENTATION DU MPA APPROFONDISSEMENT DU CDM DANS LA PHASE 1 DU PROJET EUROPEEN C-ATM
- NA05-234: NOTE DE PRESENTATION DU MPA UTILISATION D'UN EYE-TRACKER DANS LE PROJET GATE TO GATE
- NA05-244: ANNEXE TECHNIQUE AU BC N.01/05 SUR LE MARCHE 03.19.016-AMO SUR G2G DANS LA PHASE 6 DU PROJET
- NT05-247: EXPRESSION DES BESOINS EN PARTICIPATION CONTROLEURS DTI/SDER POUR FIN 2005-2006
- NT05-248: C/R SUCCINCT DE LA REUNION OSED ATFCM DE C-ATM DU 9 SEPTEMBRE 2005--
- NT05-259: BREF C/R DE LA REUNION STRATEGIE SURVEILLANCE EUROCONTROL DU 16 SEPTEMBRE 2005 A LA DSNA
- NT05-262: PROPOSITION DE PARTICIPATION DSNA A LA REPONSE EPISODE III A L'IP13 ATM VALIDATION
- NT05-272: COMPTE-RENDU DE LA VISIOCONFERENCE EPISODE III DU 29 SEPTEMBRE 2005
- NT05-292: COMPTE-RENDU DE LA REUNION OSED IM&S C-ATM DU 4 OCTOBRE 2005
- NT05-310: ETAT DES LIEUX DE LA PROPOSITION IP13/EPISODE III--EN DATE DU 19 OCTOBRE 2005--
- NT05-316: COMPTE-RENDU DE LA REUNION IP13/EPISODE III A BRETIGNY LE 20 OCTOBRE 2005
- NT05-331: DIFFERENCE ENTRE SERVICES ET APPLICATIONS DE LIAISONS DE DONNEES AIR-SOL
- NT05-557: C/R REUNION WP3.2.1 DU 09/02/2005
- NA05-765: CAHIER DES CHARGES POUR LA REALISATION D'UN SUPPORT MULTIMEDIA DANS LE CADRE DES EXPERIMENTATIONS G2G
Retour à la page principale
Pour toute demande d'aide, d'information ou d'accès, veuillez vous reporter au forum du site..