- NA01-049: CCTP DE PRESTATIONS ERGONOMIQUES POUR LE PROJET ADAGIO
- NA02-073: ANNEXE TECHNIQUE POUR LE BON DE COMMANDE N.1 SUR LE MARCHE 99.12.021
- NA02-091: RAPPORT DE PRESENTATION A ENVOYER EN PRE-EXAMEN A LA CSM,AVANT APPEL D'OFFRES.
- NA02-141: ANNEXE TECHNIQUE DU BON DE COMMANDE BC01 DU MARCHE 01.19.024
- NA02-149: RAPPORT DE PRESENTATION POST-CHOIX DU PROJET DE MARCHE RELATIVES AUX PRESTATIONS D'ETUDES ET DE DEVELOPPEMENT INFORMATIQUE POUR LA CONCEPTION ET L'EVALUATION DE L'OUTIL DE GESTION DES SECTEURS D'ATTENTE EN APPROCHE ADAGIO(AO 06/01)
- NA02-187: RAPPORT DE PRESENTATION A ENVOYER EN PRE-EXAMEN A LA CSM,AVANT APPEL D'OFFRES: PRESTATIONS EN ERGONOMIE POUR LA CONCEPTION ET L'EVALUATION DE L'OUTIL DE GESTION DE SECTEURS D'ATTENTE EN APPROCHE ADAGIO
- NA02-204: COMPTE-RENDU DU FORUM CENA DU 08/10/02
- NA02-229: ANNEXE TECHNIQUE DU 4EME BON DE COMMANDE DU MARCHE 01.19.024
- NA02-230: PREETUDE RELATIVE A L'ANALYSE DES INCOHERNCES DE
- NA02-234: ANNEXE TECHNIQUE BCMUO 1 / MARCHE 02.004 :
- NA03-028: RAPPORT DE PRESENTATION POST-CHOIX DU PROJET DE MARCHE RELATIF AUX PRESTATIONS EN ERGONOMIE POUR LA CONCEPTION ET L'EVALUATION DES OUTILS DE GESTION DES SECTEURS D'ATTENTE ADAGIO(AO 02/10)
- NT03-057: COMPTE-RENDU DE LA REUNION DU 13 FEVRIER 2003 SUR LA SURETE DE FONCTIONNEMENT D'ADAGIO BASE
- NA03-091: PROLONGATION DE DELAIS CONTRACTUELS PREVUS AU MARCHE 03.19.005
- NA03-092: BON DE COMMANDE NR 1 DU MARCHE 03.19.005: RECUEIL D'EXPERTISE CONCERNANT L'UTILISATION DES INFORMATIONS RADAR
- NA03-101: CAHIER DES CHARGES D'UN OUTIL-PROTOTYPE D'ANALYSE DES INCOHERENCES DE PLANS DE VOLS IMPACTANT L'ATFM
- NT03-115: METHODE PRECONISEE PAR LA DIVISION SDF POUR L'ANALYSE DE SURETE DE FONCTIONNEMENT D'ADAGIO BASE ET APPLICATION AU CALCUL D'UN TAUX MAXIMUM D'ERREUR RADAR.
- NA03-128: PREPARATION D'EXERCICES DE SIMULATION ORIENTES GRANDES APRROCHES
- NA03-129: RAPPORT DE JUSTIFICATION D'UN MARCHE SANS FORMALITE POUR LA CONDUITE DE PRESTATIONS RELATIVES A LA PREPARATION D'EXERCICES DE SIMULATION.
- NA04-038: ADDITIF N.1 AU CCTP NA01-50 CONCERNANT LA CONCEPTION DES OUTILS ADAGIO
- NA04-041: RAPPORT DE PRESENTATION DE L'AVENANT N.1 AU MARCHE 02.19.10.
- NA04-052: ANNEXE TECHNIQUE : SPECIFICATIONS FONCTIONNELLES DE L'INTERFACE D'UNE POSITION EN-ROUTE TERMINALE INTEGRANT ADAGIO COTAP
- NA04-060: DOSSIER DE CONSULTATION POUR DES PRESTATIONS DE PSEUDO-PILOTE LIEES AU PROJET ADAGIO ET TAMATA
- NA04-066: MODIFICATION DES SPECIFICATIONS TECHNIQUES DES PRESTATIONS DE L'UC4 DU MARCHE 02.19.010
- NA04-095: RECOMMANDATIONS ERGONOMIQUES POUR LA CONCEPTION D'UN OUTIL HORS LIGNE DES INCOHERENCES DE PLANS DE VOL AYANT UN IMPACT SUR L'ATFM
- NT04-154: EXPRESSION DES BESOINS D'EXTRACTION,DE RESTITUTION ET DE STOCKAGE DE DONNEES EN VUE DES EXPERIMENTATIONS TAMATA ADAGIO EN 2004.
- NA04-160: PROLONGATION DE DELAIS CONTRACTUELS PREVUS AU MARCHE 02.19.010
- NA04-163: MODIFICATIONS DE SPECIFICATIONS TECHNIQUES DES PRESTATIONS DE L'UNITE DE COMMANDE 5 DU MARCHE 02.19.010
- NA04-194: PROLONGATION DE DELAIS CONTRACTUELS PREVUS AU MARCHE 03.19.005
- NA04-231: CODAGE,RESTITUTION ET ANALYSE STATISTIQUE DE DONNEES POUR LES EXPERIMENTATIONS ADAGIO 2004
- NA04-242: METHODES DE TRAVAIL ET SPECIFICATIONS IHMS SUR LA PLATE-FORME EXPERIMENTALE GATE TO GATE INTEGRANT LES OUTILS ADAGIO.
- NA04-247: DOSSIER DE CONSULTATION POUR DES PRESTATIONS DE CONTROLEUR POUR LES SIMULATIONS TAMATA ET ADAGIO
- NA04-256: CHOIX DE PRESTATAIRE DE SERVICE POUR LA FOURNITURE DE PRESTATION DE CONTROLEURS.
- NA04-284: ANNEXE TECHNIQUE POUR UN BC SUR MARCHE 02.19.010-SYNTHESE ET DIFFUSION DE RESULTATS 2003-2004 DU PROJET CALLIOPE
- NT05-001: HISTORIQUE DU PROJET CALLIOPE
- NA05-026: PROLONGATION DU DELAI CONTRACTUELS PREVU A L'UC7 DU MARCHE 03.19.005
- NT05-032: PREMIER RETOUR D'EXPERIENCE TECHNIQUE DES OUTILS MIS EN !UVRE DANS LE CADRE DES EXPERIMENTATIONS ADAGIO 2004
- NT05-077: C/R DE LA REUNION SEQUENCEUR POUR G2G DU 11/02/05
- NA05-084: DOSSIER DE CONSULTATION POUR DES PRESTATIONS DE PSEUDO-PILOTES EN VUE DE SIMULATIONS LIEES AUX PROJETS GATE TO GATE ET VIGIESTRIP A LA DSNA/DTI/SDER DANS LES LOCAUX D'ATHIS-MONS.----
- NA05-090: DOSSIER DE CONSULTATION: PRESTATIONS DE CONTROLEURS POUR LES SIMULATIONS DU PROJET GATE TO GATE 2005 DANS LES LOCAUX D'ATHIS-MONS DE LA DSNA/DTI/SDER.--
- NT05-096: POINT D'AVANCEMENT DES TRAVAUX RELATIFS A LA FONCTION COORDINTATION DE LA PLATE-FORME GATE TO GATE 2005
- NA05-101: CHOIX DE LA SOCIETE ASSURANT LES PRESTATIONS DE PSEUDO-PILOTES POUR DES SIMULATIONS LIEES AUX PROJETS GATE TO GATE ET VIGIESTRIP A LA DSNA/DTI/SDER DANS LES LOCAUX D'ATHIS-MONS.
- NA05-112: CHOIX DU PRESTATAIRE DE SERVICE POUR LA FOURNITURE DE PRESTATION DE CONTROLEUR POUR DES SIMULATIONS DE TRAFIC AERIEN A LA DSNA/SDER DANS LES LOCAUX D'ATHIS-MONS.
- NT05-122: COMPTE RENDU DE LA 9EME REUNION DU COMITE DE SUIVI DU PROGRAMME GATE TO GATE 2005 TENUE LE 12 ET 13 AVRIL A NAPLES
- NT05-142: COMPLEMENTS SUR LA FONCTION COORDINATION DE LA PLATE-FORME GATE-TO-GATE 2005
- NA05-144: EVALUATION D'UN NOUVEAU MODELE DE PLAN DE VOL ET ANALYSE DES ECARTS D'ESTIMATION DES HEURES DE VOL CONTROLES.
- NA05-173: AMENDEMENT N.4 AU CCTP NA01-050
- NA05-181: RAPPORT DE PRESENTATION DE L'AVENANT N.2 AU MARCHE 02.19.010
- NT05-195: COMPTE-RENDU DE LA 10EME REUNION DU COMITE DE SUIVI DU PROGRAMME GATE TO GATE 2005 TENUE A MADRID--LES 05 ET 06 JUILLET 2005--
- NA05-202: PROLONGATION DU DELAI CONTRACTUEL PREVU POUR LA TC4 DU MARCHE 02.19.004
- NA05-251: COMPTE-RENDU DU FORUM SDER DU 13 SEPTEMBRE 2005
- NA05-276: CCTP MAINTENANCE CORRECTIVE DES COMPOSANTS ADAGIO POUR LA CAMPAGNE D'EXPERIMENTATION GATE TO GATE D'OCTOBRE A DECEMBRE 2005.
- NA05-280: NOTE JUSTIFICATIVE DE MPA MAINTENANCE CORRECTIVE DES COMPOSANTS ADAGIO SUR LA PLATE-FORME GATE TO GATE
- NA05-323: ANNEXE TECHNIQUE POUR UN BC SUR MARCHE 03.19.005-ANALYSE COMPLEMENTAIRE DE DONNEES ISSUES DES EXPERIMENTATIONS TAMATA/ADAGIO
- NT05-341: COMPTE-RENDU DE LA 11EME REUNION DU COMITE DE SUIVI DU PROGRAMME GATE TO GATE 2005 TENUE DANS LES LOCAUX DE LA SDER A ATHIS-MONS LE 22 ET 23 NOVEMBRE 2005--
- NA05-649: ANNEXE TECHNIQUE: ETUDE PRELIMINAIRE SUR LES IMPACT TECHNIQUE DES DIALOGUES DE COORDINATIONS SUR LA PLATE-FORME DE SIMULATION DU PROJET GATE TO GATE 2005
- R05-013: ETUDE VOCALISE SECURITE ENROUTE:--IMPACT DES COMMUNICATIONS VOCALES SUR LA SECURITE DU TRAFIC
- NT06-039: COMPTE-RENDU DE LA REUNION DU 21 AU 23 JUIN 2006 RELATIVE A LA CONSOLIDATION DE L'ANNEXE TECHNIQUE DU PROJET EPISODE 3 TENUE A BRETIGNY
- NT06-044: INVENTAIRE DES AXES DE TRAVAIL ENVISAGEABLES PAR LA DTI DANS LE CADRE DU PROJET EPISODE 3 DU 6EME PCRD
- NA06-069: NOTE DE PRESENTATION DE LA CONVENTION RELATIVE AU PROJET AMANDA V3
- NA06-100: BESOINS D'AMELIORATION DU PROCESSUS D'EVALUATION D'UN OUTIL ATC PAR SIMULATIONS EN TEMPS REEL :LE RETOUR D'EXPERIENCE DU PROJET ADAGIO
- NA06-105: CCTP D'ASSISTANCE A MAITRISE D'OUVRAGE POUR LA NEGOCIATION ET LA PREPARATION DU PROJEUT EUROPEEN EPISODE 3
- NT06-123: COMPTE-RENDU DE LA REUNION DU 27/04/06 CONCERNANT LA PARTICIPATION DU GROUPE AIR FRANCE KLM AU PROJET EPISODE 3
- NA06-124: NOTE JUSTIFICATIVE DU MPA ASSISTANCE A LA MAITRISE DOUVRAGE POUR LA NEGOCIATION ET LA PREPARATION DU PROJET EUROPEEN EPISODE 3"
- NA06-137: PROLONGATION DU DELAI CONTRACTUEL PREVU POUR LE BON DE COMMANDE 01/05 DU MARCHE 03.19.016
- NT06-154: COMPTE-RENDU DE LA REUNION DU 29 ET 30 MAI 2006 LIE A LA NEGOCIATION DES WP2 ET 3 DU PROJET EPISODE 3 DU 6EME PCRD
- NT06-155: PREMIERE SELECTION DES AXES DE TRAVAIL DE LA DTI DANS LE CADRE DU PROJET EPISODE 3
- NA06-164: ANNEXE TECHNIQUE AU BON DE COMMANDE N.01/06 SUR LE MARCHE 03.19.016: PRESTATIONS D'AMO SUR G2G DANS LA PHASE FINALE DU PROJET--
- NT06-187: COMPTE-RENDU DE LA REUNION DU 6 JUILLET 2006 RELATIVE A LA PRESENTATION DE LA REVISION DU PROGRAMME DE TRAVAIL EPISODE 3 A LA COMMISSION EUROPEENNE.
- NT06-193: COMPTE-RENDU DE LA REUNION DU 18 JUILLET 2006 RELATIVE AUX PROJETS EUROPENS ERASMUS ET EPISODE 3.
- NA06-208: PROLONGATION DU DELAI CONTRACTUEL PREVU POUR LE BON 02/06 DU MARCHE 03.19.005
- NA06-221: ANNEXE TECHNIQUE AU BON DE COMMANDE SUR UNITE D'OEUVRE N.02/2006 DU MARCHE 03.19.012---COMMUNICATION EXTERNE DES RESUTATS D'EVALUATION DES SIMULATIONS DE LA DSNA AU TITRE DU PROJET GATE TO GATE.
- NA06-280: PRE-ETUDE DE DEFINITION D'UNE NOUVELLE POSITION EN-ROUTE A EVALUER DANS LE CADRE DU PROJET EUROPEEN EPISODE 3
- NA06-289: NOUVELLE PROLONGATION DU DELAI CONTRACTUEL PREVU POUR LE BON 02/06 DU MARCHE 03.19.005
- NA06-312: CCTP ASSISTANCE A LA MAAITRISE D'OUVRAGE DU PROJET EPISODE 3
- NT06-316: RAPIDE BILAN FINANCIER DU PROJET EUROPEEN GATE TO GATE DU 5EME PCRD
- NT07-048: COMPTE-RENDU DE LA REUNION DU 13 MARS 2007 RELATIVE A LA PRE-ETUDE DE DEFINITION D'UNE NOUVELLE POSITION EN-ROUTE POUR LE PROJET EPISODE 3
- NT07-056: COMPTE RENDU DE LA REUNION DU 26 MARS 2007 RELATIVE A LA CONTRIBUTION DU POLE MTC DANS LE CADRE DU PROJET EPSIODE 3
- NA07-079: RAPPORT DE PRESENTATION DU MARCHE D'ASSISTANCE A MAITRISE D'OUVRAGE DU PROJET EPISODE 3 DU 6EME PCRD.
- NT07-096: COMPTE-RENDU DE REUNION DU 14/06/07 CONCERNANT LA PREETUDE POUR EPISODE 3 ET LE CONCEPT MSP
- NT07-104: COMPTE-RENDU DE REUNION DU 25/06/07 CONSOLIDANT LE PERIMETRE FONCTIONNEL DU CONCEPT MSP A DETAILLER DANS LA PREETUDE EPISODE 3
- NA07-105: 3EME PROLONGATION DU DELAI CONTRACTUEL PREVU POUR LE BON 02/06 DU MARCHE 03.19.005
- NT07-148: COMPTE-RENDU DE LA REUNION DU 28/08/07 SUR LES CONTRIBUTIONS DU POLE MTC AU PROJET EPISODE 3
- NT07-149: COMPTE-RENDU DE LA REUNION DU 12/09/07 SUR LE PLAN DE TRAVAIL DU POLE MTC SUR LE PROJET EPISODE 3
- NA07-159: ANNEXE TECHNIQUE AU BON DE COMMANDE N.01/07 SUR LE MARCHE 07FRD0120--PRESTATIONS D'AMO SUR EPISODE 3 DANS LA PHASE 1 DU PROJET--
- NT07-166: BREF RELEVE DE DECISION POUR LA REUNION DE LANCEMENT DU MARCHE AMO EPISODE 3 DU 12/10/07
- NA07-195: PROLONGATION DE DELAI CONTRACTUEL PREVU POUR LE BON 01/07 DU MARCHE 06.12.065